中國核能可持續(xù)發(fā)展論壇-2019年春季國際高峰會議
報告摘要
臺山核電站一期工程建設(shè)情況
A Brief of Taishan Nuclear Power Plant Phase I Project
報告摘要:
EPR(歐洲壓水堆)核電技術(shù)是在法、德國兩國成熟核電技術(shù)基礎(chǔ)上開發(fā)形成的三代壓水堆核電技術(shù),滿足歐洲EUR(歐洲用戶要求)和美國URD(用戶要求文件)相關(guān)要求。臺山核電站一期工程作為全球第三個開工的EPR項目,建設(shè)2臺單機容量為175萬千瓦的壓水堆核電機組。1號機組于2009年10月開工建設(shè),目前已完成建設(shè)并投入商業(yè)運行。2號機組已完成機組熱態(tài)功能試驗,正在開展裝料準(zhǔn)備工作。本報告主要介紹了臺山核電站一期工程的基本情況、主要特點、建設(shè)進(jìn)展等情況,并對后續(xù)安排進(jìn)行展望。
Abstract:
EPR(European Pressurized Reactor) is a Generation 3 technology developed and evolved from the latest nuclear power plants in operationin France and Germany. It meets the technicalrequirements of European EUR and U.S. URD. Taishan Nuclear Power Plant Phase I project has been the third project started to build EPR in the world, 2 units with brand output of 1750MW per unit was approved in October of 2009. To date, Unit 1 has been put into operation after completion of construction and commissioning activities. The hot functional test of Unit 2 was succeeded at the beginning of 2019. The preparatory work for Unit 2 fuel loading is ongoing as scheduled. In this paper, general information, major characteristics and progress of Taishan EPR project as well as some perspective aspects for coming stage,are presented.